Location :
Caen (14)
Client :
CHU de CAEN
Main Architect and coordination :
BRUNET SAUNIER
Partner architect  :
VIB architecture
(1st phase : urban plan + laboratories)
Urban design :
TH1 – Plilippe Villien
Landscape design :
INLANDIS
Mission :
Competition 2017
Surface :
20 000m² SDO + 90 000 m² SDO
Construction cost :
60 M€ + 170 M€
Engineering
YGREC iNGENIERIE / WSP
Environmental Consultant
INDDIFO
Quantity surveyor
AR75
Accoustics :
SIGMA acoustics
Logistics
FL Conseil
General Planning and organisation
IM PROJECT

3D graphics:
© IDA+ et ©LABANK

Existing Hospital when build.

 

 

Share this project …

Invited Competition

Reconstruction of Caen’s Hospital |Caen (14)

The project aims at rebuilding the exisitng (but obsolete and poluted) hospital. Its main obejctives are to regroup new services for a regional hospital with 1049 beds and 22 chirurgical blocks.

A new approach to Hospital’s programatic mixity.

[FR]

Afin de minimiser l’usage du foncier pour des constructions, au profit d’espaces extérieurs comme parkings et espaces paysagers libres pour des constructions futures, nous avons opté pour une solution compacte, en fusionnant le bâtiment Biologie/Internat avec le bâtiment Logistique/Pharmacie. Ainsi le terrain étriqué derrière Esquirol ne sera pas investi par un bâtiment et pourra servir le temps nécessaire au chantier du tram.

La mutualisation des deux bâtiments nous permet de les centrer au maximum dans le site global du CHU, tout en restant dans le périmètre attribué à l’opération. La Logistique/Pharmacie, point névralgique des tous les arrivées et départs logistiques du CHU, se trouve ainsi au cœur du site, d’où elle irriguera par des galeries souterraines tous les bâtiments existants et futurs.

[FR]

 

1ST PHASE

 

 

 

2nd PHASE